Days 15 and 16 - Most walls painted and floor prepared


The last today most walls have been painted, the radiators have be reinstalled, the valves have been installed, and the floor in the living room, the sleeping room, and the corridor have been prepared for the lay of the laminate. The next step will be the painting of the rest of the kitchen and then übermorgen the laying of the laminate. After that only the new sleeping room door has to be installed and the work of the electrician has to be finished. *yeah*